M25 clockwise between J3 and J4 | Clockwise | Resurfacing

On the M25 clockwise between junctions J3 and J4, expect delays of up to 10 mins at peak times due to carriageway resurfacing closing two lanes, between 10 pm and 5 am, from 23 September 2015 to 24 September 2015.

Archived from Traffic Reports at 3:23 pm, September 23, 2015