M42 at junction 7A with the M6 | Northbound | Resurfacing

On the M42 northbound at junction J7A, expect delays of up to 10 mins at peak times due to carriageway resurfacing closing two lanes, between 10 pm and 6 am, from 21 September 2015 to 22 September 2015.

Archived from Traffic Reports at 1:04 am, September 21, 2015