A55 : Roadworks, J35a Warren Hall

A55 J35a Warren Hall – Lane 2 closures, east and westbound from pm 24th January to pm 7th February (24 hour ) to carry out central reserve safety fence works as part of the major scheme. Residual lane widths will be 3.65m but a 1m nearside strip is available for wider loads..Sunday, January 24, 2010 – Sunday, February 07, 2010

Archived from Traffic Wales at 12:00 am, January 24, 2010